Services

Native iOS app development

Swift and SwiftUI. Design, build, App Store launch, post-release support.

Updated

Timeline21 days
In short

A native iPhone and iPad app in Swift: design, development, App Store release and support after launch. Timeline: 21 days. Priced after a short brief.

What's included

  • Swift 6 + SwiftUI
  • Backend API integration
  • Push notifications via APNs
  • In-App Purchase, subscriptions
  • Apple ID, Sign in with Apple
  • App Store launch
  • Apple Watch / iPad adaptation on request

A native iPhone app built in Swift and SwiftUI means smooth animation, instant response and the behavior Apple users expect. We design, build and publish apps that pass App Store review and run predictably on current iOS versions. The work is done by a small team without layers of management, so decisions are quick and you talk directly to the people writing the code.

Who it's for

  • Companies that have a web service and an API and need a mobile app for their customers.
  • Products where the iPhone audience pays: subscriptions, premium services, B2B tools.
  • Teams whose current app is slow, crashes or keeps getting rejected in review.

How we work

  1. Brief and prototype. We go through the task, audience and usage scenarios, then build a screen map and a clickable prototype to agree the logic before any code is written.
  2. Design to Human Interface Guidelines. The interface follows native iOS patterns, so the app feels at home on the device rather than ported from another platform.
  3. Development in iterations. Swift 6 and SwiftUI, with UIKit where SwiftUI still falls short. Work is split into weekly sprints, and each ends with a TestFlight build you can try on your own phone.
  4. Integrations and testing. We connect your backend, push notifications and payments, test on real devices and screen sizes and clean up crashes before release.
  5. App Store release. We prepare the App Store Connect listing, screenshots and Privacy Manifests, go through Apple's review and publish.
  6. Handover and maintenance. You get the source code, access and documentation, and we agree on an update plan.

What you get

More than a compiled file: a working process around it. Source code in your repository, documentation on architecture and builds, and CI set up for future releases. Privacy Manifests and App Tracking Transparency done properly, because without them Apple rejects updates. Analytics and crash reporting from the first release, so you can see what is happening on users' devices instead of guessing from reviews. Sign in with Apple and payments on StoreKit 2, set up according to platform rules, with RevenueCat or Adapty for subscriptions if that suits you. Push notifications through APNs. On request we adapt the interface for iPad with multitasking and split view, build a companion app for Apple Watch, or add Live Activities. Universal Links connect the app with your website so links open in the right place.

Timeline and cost

The reference point is 21 days for a medium-sized app: a few key screens, authentication and integration with an existing API. Projects with complex logic, such as subscriptions, offline mode, maps or background sync, take longer and are split into stages with intermediate builds. We give an exact timeline after the brief, once the number of screens and integrations is clear.

Cost is also estimated after a short brief. It depends on the number of screens, the complexity of the logic, integrations, whether a backend needs to be built or already exists, and add-ons like iPad or Apple Watch. You get the figure before work starts, with no surprises along the way.

Example

For example, for a company with a web service and an API that wants a mobile app for its clients, we would start with a prototype to cut unnecessary screens before development. We agree with the backend team on the data format and authentication, connect push through APNs and Sign in with Apple. The client gets the first TestFlight build within the first weeks and tests it on their own devices, so changes happen before publication, not after. We go to Apple review with Privacy Manifests ready, which avoids a chain of rejections and rework.

What we need from you

  • A description of the task. An API and brand guidelines help; if there are none, we'll build the screen map and prototype together.
  • An Apple Developer account registered to your company. That way the app belongs to you, not to the contractor. We'll help register it if needed.
  • Someone on your side who can test builds and give feedback within a day or two.

Most products also need Android; see native Android app development. After release an app needs regular updates for new iOS versions and store policy changes, which is covered by mobile app support. If you are weighing frameworks: SwiftUI vs UIKit in 2026 — production reality.

FAQ

How long does it take to build an iOS app?
A medium-sized app with an existing API takes about three weeks. Subscriptions, offline mode and maps add time; such projects are split into stages.
What does the cost depend on?
The number of screens, the complexity of the logic and the integrations. We estimate once we see the scope, with no surprises during the project.
Do you publish the app to the App Store?
Yes, end to end: the App Store Connect listing, screenshots, Privacy Manifests and Apple review.
Do I need my own Apple Developer account?
Yes. It should be registered to your company so the app belongs to you. Moving an app between accounts later is painful. We'll help set it up.
What about updates after release?
We update for new iOS versions, fix what users find and extend features. An app left without updates usually starts breaking within a couple of years.
What do you build with?
Swift 6 and SwiftUI, with UIKit in places. Push through APNs, purchases on StoreKit 2, sign-in with Sign in with Apple.
Other services
(01) Website development Custom corporate website: bespoke design, service and project pages, lead forms, responsive layout, SEO foundation. → (02) E-commerce store Catalog, filters, cart, checkout. Integrations with ERP, warehouse, payment gateways, delivery and marketplaces. → (03) Landing page development Single-page site for ad traffic. Conversion-focused, optimized messaging, A/B tested after launch. → (04) Custom CRM development When off-the-shelf doesn't fit — we build custom. Customer base, pipelines, tasks, analytics, mobile. → (05) MAX bot Russian VK MAX messenger bot. Same capabilities as Telegram bot, separate audience. → (06) Telegram bot Lead intake, FAQ, broadcasts, payments. Connected to CRM, ERP, warehouse, marketplaces. → (07) Web application development SaaS, dashboards, internal tools, B2B portals. Modern frontend, robust backend, fast iteration. → (08) Native Android app development Kotlin and Jetpack Compose. Target Google Play and regional alternatives (RuStore, AppGallery). → (09) Technical support for website or app An on-call engineer, not an answering machine. Monitoring, backups, updates and dev hours, with response times you can hold us to. → (10) Content support for website and e-commerce Product uploads, photo prep, descriptions written for search, imports from spreadsheets and ERP. Your catalogue stays current. → (11) Website redesign and rebuild A new design and a rebuilt core without losing rankings: a custom theme instead of a page builder, a fast mobile site, every old URL in place. →